Construction time:
Address:
г. Казань
Completed work:
The works were completed in a record-short time - 4 months!
During the overhaul, the facility supplied and installed refrigeration and ventilation-climatic equipment of its own production, replaced all engineering communications, installed translucent structures from aluminum profiles, suspended ventilated facades with ceramic granite cladding.
Completed work:
Engineering
Production of ventilation, air-conditioning and refrigeration equipment
Construction installation work