Construction time:
2015 г.
Address:
Республика Татарстан, с. Большие Кайбицы
Completed work:
Installation of supply and exhaust ventilation systems, internal drainage, heating, heat supply, low-current systems, automation of all systems. Our specialists manufactured the Airwau TKU-23000 ventilation system for this object. This system is our development, which has no world analogues. The efficiency of the return (recovery) of energy by this installation during the heating period is twice the efficiency of heat pumps. which are commonly used in similar European designs. Another advantage of Airwau TKU-23000 is that the heat recovery system in a hot time can cool the air in the hall and drain it.
Completed work:
Design
General contracting
Production of ventilation, air-conditioning and refrigeration equipment
Engineering
Быстровозводимые здания